Diamond Knot Logo
Diamond Knot B2 website as of
 
Main Menu

Brewing



Tearing Down the Old Brewery



Building the New



>  Plans



Other Sites

Our Main Site



Our Pub



B1 Brewery



Our Beers


The Plans

Mash auger

Check out the floor plan and construction drawing(s) the guys are working from.

This plan show the detail that Brian is capable of, as well as the fore-thought that went into this project.  Notice the space between the fermentation tanks in the top of the drawing - that is for a bottling line in the near future!    This image opens as a Adobe Acrobat image, so you need Acrobat reader, and little patience to download the file.

 

The second drawing  - This is a lay-out of the 2-Row Pale Malt Hopper, the Malt Mill, and the relative orientation of the Flex Auger that supplies crushed malt to the Mash Tun. It is a somewhat incomplete lay-out, and was used to communicate our requirements to the grain handling system supplier (Industrial Systems and Fabrication of Spokane, WA). The Flex Auger is 3.5" in diameter and will deliver 100 lbs / min to the Mash Tun, thereby eliminating the need for a Grist Case. The Mill is capable of cracking 8,000+ lbs / hr.

This image opens as a Adobe Acrobat image, so you need Acrobat reader, and little patience to download the file.