Diamond Knot Logo
Diamond Knot B2 website as of
 
Main Menu

Brewing



Tearing Down the Old Brewery



Building the New

   The Floor
   After the Floor
   Laying the Tanks
   Boiler Room
   Grain Silo
   Finishing Up
> Finishing Up, Part    Duex



Plans


Other Sites

Our Main Site



Our Pub



B1 Brewery



Our Beers


Building the New - Putting the pieces together, Part Duex
Brian in fron of some fermenters



Click on any of the pictures on the left to see a full size version

These guys look like government workers.  75% watching, 25% working.

 

 

 

Close up of the panel for transferring grain from the giant silo to the pre-grind hopper.  Pat can dial in the exact number of pounds of grain to move, press a button and take a much needed break.

 

 

Distant shot of the control panel for moving grains.





 

A list of a few things to do before starting production.  Looks like they spell as well as they plan.

 

 

Brian sporting his new 'support the IAM strike'   beard.   He stopped shaving the first day of the strike, and will start shaving again when the strike ends or when Annie gets tired of it and makes him.

 

 

Bob and Pat taking their storage tank for a walk.  Seemed only fair since it had not seen the sun in several months.

 

 





 

"Glycol to Bob, Glycol to Bob, can you hear me Bob?"

 

 

Brian testing the remote control switching of the Glycol system into the individual fermentors.  Very slick system.

 

 

A closer view of the control board for movement of all fluids in the brew process.