Diamond Knot Logo
Diamond Knot B2 website as of
 
Main Menu

Brewing



Tearing Down the Old Brewery



Building the New

   The Floor
   After the Floor
   Laying the Tanks
   Boiler Room
   Grain Silo
> Finishing Up
   Finishing Up, Part    Duex



Plans


Other Sites

Our Main Site



Our Pub



B1 Brewery



Our Beers


Building the New - Putting the pieces together
Brian in fron of some fermenters



Click on any of the pictures on the left to see a full size version

Brian getting some expert help and advice.

 

 

 

Cooler big enough for the forklift with some idea of how kegs will fit in it.

 

 

 

The view from inside the drive-in cooler at one of the young helpers.





 

Outside look at the cooler with the forklift beside it for a perspective on how big the cooler is.

 

 

 

Cooler from fermeter row.  This is the door newly filled kegs will enter into, with the door showing on the left being the one they will exit from.

 

 

 

Pat and Andy working on fastening the legs of the double fermenters to the cement pad.  Don't want any rocking and rolling in these tanks.

 

 





 

A close-up of Pat's drilling technique.

 

 

 

The control panel that will precisely control the movement of grains from the silo to the grain mill without breaking a sweat in the process.

 

 

Brian demonstrating his skill in custom plumbing.