Diamond Knot Logo
Diamond Knot B2 website as of
 
Main Menu

Brewing



Tearing Down the Old Brewery



Building the New

   The Floor
   After the Floor
   Laying the Tanks
   Boiler Room
> Grain Silo
   Finishing Up
   Finishing Up, Part    Duex



Plans


Other Sites

Our Main Site



Our Pub



B1 Brewery



Our Beers


Building the New - Working on a really big grain silo
Brian in fron of some fermenters



Click on any of the pictures on the left to see a full size version

The sides of the grain silo as it was shipped here. Doesn't look very big from this perspective

 

 

 

The flexible auger that will move the grains from the silo to the grinder to the mash tun.

 

 

 

The first layer of the grain silo being laid out.





 

Jason the lead on the silo construction crew is checking out the first dry fitting for the silo.

 

 

Jason and Kyle fitting a hopper over the top of the grain mill.

 

 

 

The grain mill, the small hopper and the auger pipe going up to the mash tun.

 

 





 

The grain silo from in perspective with Kyle and Jason in front of it. Sure looks bigger than it did on the pallet.

 

 

The silo legs sit on these special sensors that will tell a control panel how much grain is in the silo by weight.

 

 

The big Brock - sure hope they rename this thing.