Diamond Knot Logo
Diamond Knot B2 website as of
 
Main Menu

Brewing



Tearing Down the Old Brewery



Building the New

   The Floor
   After the Floor
   Laying the Tanks
> Boiler Room
   Grain Silo
   Finishing Up
   Finishing Up, Part    Duex



Plans


Other Sites

Our Main Site



Our Pub



B1 Brewery



Our Beers


Building the New - Working on the Boiler Room
Brian in fron of some fermenters



Click on any of the pictures on the left to see a full size version

 

The support structure between the Mash Tun and Brew Kettle are in place with the control panels.

 

 

The work area between the Mash Tun and Brew Kettle is really a pretty steep climb.  I bet Pat learns to limit his trips up and down that access ladder.

 

 

Roofing over the boiler room.  Brian doing the hands-on work, Andy assisting, Bob in support mode.





Brian is still working away on the roof while Andy seems to be looking for a hiding place.

 

 

 

What it takes to get some roofing plywood up to the top.

 

 

 

Bob and Andy playing Russian-roulette with Brian's finger-cutting Skill Saw.







Since they survived Brian's finger cutting, Andy thought he would have a go at Bob's toes

 

 

 

Bob actually managed to walk away from this stunt without a limp.  Better luck next time Andy.

 

 

 

Look Susan, I really was working while you were gone!

 

 

How three Knotheads cut a wall panel