Diamond Knot Brewing Company
Back to the first page...
Click on any picture to view a larger image...
The Floor... After The Floor... Laying The Tanks...

These guys look like government workers.  75% watching, 25% working.

Close up of the panel for transferring grain from the giant silo to the pre-grind hopper.  Pat can dial in the exact number of pounds of grain to move, press a button and take a much needed break.

Distant shot of the control panel for moving grains.

Boiler Room... Grain Silo... Finishing Up...

A list of a few things to do before starting production.  Looks like they spell as well as they plan.

Brian sporting his new 'support the IAM strike'   beard.   He stopped shaving the first day of the strike, and will start shaving again when the strike ends or when Annie gets tired of it and makes him.

Bob and Pat taking their storage tank for a walk.  Seemed only fair since it had not seen the sun in several months.

"Glycol to Bob, Glycol to Bob, can you hear me Bob?"

Brian testing the remote control switching of the Glycol system into the individual fermentors.  Very slick system.

A closer view of the control board for movement of all fluids in the brew process.